Permit Requested

Please select one of the following options: (required)

Company

(required)
(required)
(required)
(required)
(required)
(required)
(required)

Authority for Application

The information provided in this section will be used to verify the application was submitted on the applicant’s behalf.
(required)
(required)
(required)
(required)
(required)

Declaration

Being in a position of authority and having knowledge of the plant's operation and equipment, I declare the applicant has a valid Power Engineering Licence, is trained and has intimate knowledge and experience with the specific equipment and operating procedures of the plant. Thus, at a higher level, has the capacity to safely be in charge of the boiler(s), control system, machinery, equipment and safety procedures at the plant mentioned. I recognize that a Permit to Operate in Urgent Cases is a Temporary measure and the above mentioned company is committed to achieving the Legislated staffing requirements by recruiting or through a commitment to the training and support of the power engineer in achieving his/her certification. I recognize that this commitment shall be honestly made and efforts will be made to be permit free as early as reasonably possible.

Operator Information

(required)
(required)
Please indicate the current classification in which the above mentioned is presently operating: (required)
(required)
Please indicate the higher level classification for which a permit is being requested: (required)

Plant Location

(required)

Boiler Information

Permit Information

(required)

Submission Requirements

All companies applying for this Permit to Operate in Urgent Cases are required to submit an action plan (subject to approval by the Chief Inspector)
Please select one of the following options (required):

Attachments

Maximum allowed file size: 50 MB
Most of the common document and image formats are accepted for uploading.
Reset